Design, Manufacture, Supply and Construction of 2x60MVA, 132/33kV Transformer Substation at Ekori
December 06, 2022
Design, Manufacture, Supply and Construction of 2x60MVA, 132/33kV Transformer Substation at Ekori Ugep with 2x132kV Bay Extension at Calabar and Ikom and the Design, Supply and Construction of 220km, Calabar-Ikom 132kV Double Circuit Transmission Line.